Low voltage wiring is the cabling that carries data, voice, video and control signals through a building, as opposed to the electrical wiring that powers lights and outlets. In a commercial building on Oahu it usually includes network cabling, fiber, phone lines, security cameras, access control, wireless access points and AV systems.
It rarely gets attention on a construction schedule. Electrical, plumbing and HVAC have their own trades and line items, while low voltage is often treated as something to sort out after the walls go up. That is usually when it becomes expensive.
This guide explains what falls under low voltage, when it should be planned, and what Oahu building owners, tenants and contractors should think about before the first cable is pulled.
What Counts as Low Voltage in a Commercial Building
Most modern building systems now run on low voltage cabling, and many of them share the same network.
- Data networks. Copper and fiber runs connecting computers, printers, servers and network equipment.
- Voice. Phone systems, whether traditional lines or voice over IP handsets running on the data network.
- Wireless access points. Usually mounted in ceilings and powered over the network cable itself through Power over Ethernet (PoE).
- Security cameras. IP cameras that send video and receive power over a single cable.
- Access control. Card readers, door hardware and intercoms at entrances and secure areas.
- Audio visual. Displays, speakers, conferencing equipment and digital signage.
- Paging and background music. Common in retail, hospitality and schools.
- Building systems. Sensors and controls for lighting, HVAC and energy management.
Because so many of these now depend on the network, planning them separately is one of the most common and costly mistakes. One coordinated low voltage design keeps pathways, closets and power budgets in order. Our post on structured wiring in Hawaii covers how this organized approach supports modern properties.

Copper and Fiber: Where Each One Fits
Copper network cable such as Cat6 or Cat6A handles most connections to individual devices. It carries both data and power, which is why cameras and wireless access points rely on it.
Fiber optic cabling takes over for backbone links between floors and buildings, long distances, and connections that need very high bandwidth. It is also immune to electrical interference, which helps in buildings with heavy equipment or long parallel runs near power lines. Most Oahu commercial projects use both: fiber as the backbone and copper to the device.
For a closer look at cable categories and how they hold up in island conditions, see our guide to choosing between Cat6, Cat6A and fiber.
When to Bring In a Low Voltage Contractor
The short answer is earlier than most projects do. The best time is during design, when the architect and electrical engineer are still laying out the space.
- Design. Locate telecom rooms, plan pathways and conduit, and set outlet, camera and access point locations.
- Rough in. Install pathways, sleeves and backboxes and pull cable before walls and ceilings close.
- Finish. Terminate, label and test every run, then mount devices and faceplates.
- Turnover. Hand over test results and as built drawings so the owner knows exactly what was installed.
When low voltage joins after drywall, every run turns into surface raceway, ceiling access or wall patching, and choices like closet location are already locked in.
Low Voltage Planning Checklist
- Where will the main and floor telecom rooms go, and do they have power and cooling?
- How many data drops does each workstation, conference room and common area need?
- Where will wireless access points sit for full coverage?
- Which doors need card readers, and where will cameras go?
- Will the network switches have enough PoE capacity for every powered device?
- Is there room in pathways and closets for growth?
- Who will document and label the finished system?
Notes for Oahu Projects
- Coordinate with the electrical trade. Low voltage and power share ceilings and walls, so early coordination prevents conflicts and rework.
- Plan for humidity and salt air. Closets near the coast and exterior walls need ventilation, and connections should be protected from moisture.
- Order materials early. Cable, racks and devices ship from the mainland, so lead times belong in the schedule.
- Expect older building surprises. Many Honolulu buildings have full conduit or limited ceiling space, which a site walk will reveal.
Frequently Asked Questions
What is the difference between low voltage and electrical wiring?
Electrical wiring carries power to lights, outlets and equipment. Low voltage wiring carries communication and control signals, and sometimes small amounts of power through PoE, to devices such as computers, cameras, phones and access points.
Do I need a separate contractor for low voltage?
Many projects use a dedicated low voltage or structured cabling contractor alongside the electrician. Specialists bring the design, termination, testing and documentation that data and communication systems need.
Is fiber optic cabling necessary for a small office?
Not always. Small offices on one floor often run entirely on copper. Fiber becomes important for links between floors or buildings, long distances, and service from the internet provider.
Can low voltage wiring be added to an existing building?
Yes, though it usually costs more than installing during construction. A site survey shows which pathways are available and how to reach each location with the least disruption.
Plan Your Low Voltage Project With CCSI